Las Vegas Construction Draw Inspections & Lender Progress Verification

Protect construction loan capital against front-loaded pay applications and stalled schedules. Independent field verification across Las Vegas, Henderson, Summerlin, and North Las Vegas.

Eyes on the Ground for Out-of-State & Regional Construction Lenders

Disbursing construction funds purely off contractor invoices or self-submitted smartphone photos exposes lenders and equity sponsors to front-loaded billing, unverified stored materials, and uncompleted rough-in milestones. When a project stalls mid-build, any gap between funds disbursed and physical work-in-place comes straight out of lender recovery.

Echo Point Inspections serves as your independent Clark County field representative—auditing contractor pay requests directly against physical jobsite progress for ground-up commercial builds, Tenant Improvement (TI) buildouts, multi-family Cap-Ex rehabs, and private-lender renovation loans.

Optional Aerial Site Telemetry via Echo Point Aero For ground-up pads, multi-building apartment sites, and commercial roof replacements, pair ground draw verification with repeatable FAA Part 107 aerial progress imagery from sister division Echo Point Aero—giving loan committees an indisputable bird's-eye record of every draw cycle.

What Every Construction Draw Audit Verifies

  1. AIA G702 / G703 Line-Item Reconciliation: Independent percent-complete assessment for every CSI division on the Schedule of Values—comparing GC requested % vs. inspector-verified % in place.
  2. On-Site Stored Materials Audit: Confirming that high-ticket materials billed prior to installation (switchgear, RTUs, storefront framing, cabinetry, flooring pallets) are physically on site, serialized where applicable, and protected from Mojave sun and monsoon moisture.
  3. Municipal Permit Card & Municipal Sign-Off Check: Photographing on-site Clark County, City of Las Vegas, City of Henderson, or City of North Las Vegas building permit cards and visible municipal inspector sign-offs (underground, slab, framing, rough MEP).
  4. Jobsite Activity & Schedule Pulse: Recording active trade crews on site, material staging, site safety/housekeeping, and visible schedule bottlenecks or change-order impacts.

Milestone Verification Schedule

Construction Phase Field Verification Checkpoints Common Over-Billing Risks Caught
Draw 1: Sitework & Foundation Caliche excavation, underground plumbing/conduit trenches, vapor barrier, post-tension or rebar placement, concrete slab pour. 100% foundation draw billed when underground utilities or vapor barriers are incomplete.
Draw 2: Structure & Dry-In Wood/metal stud framing, CMU or tilt-up erection, roof deck, single-ply/tile roofing, exterior sheathing, and windows. "Dry-in complete" billed before parapet flashings, scuppers, or storefront glazing arrive.
Draw 3: Rough MEP & Insulation HVAC ductwork/curbs, rough electrical panels & home-runs, domestic/DWV plumbing, fire sprinkler drops, batt/spray insulation. Rough HVAC billed at 90% when only duct trunks are hung and RTUs are still backordered.
Draw 4: Drywall, Stucco & Finishes Drywall hang/tape/texture, 3-coat stucco/EIFS, T-bar acoustic grid, tile, millwork, painting, and trim-out fixtures. Finish carpentry or flooring billed as installed while still sitting in off-site warehouse storage.
Final Draw: Punchlist & Retainage energized MEP functional spot-check, paving/striping, landscaping, Certificate of Occupancy / Temporary CO documentation. Premature retainage release requested prior to RTU commissioning or final municipal sign-off.

Funding a value-add apartment reposition as well? See our Multi-Family & Four-Plex Investor Due Diligence track for pre-acquisition Cap-Ex scoping.

Construction Draw Inspection FAQs

What is a construction draw inspection?

A construction draw inspection (also called a lender progress verification) is an independent on-site audit performed before a bank, SBA lender, or private debt fund releases progress payment funds to a general contractor. We verify that billed line items on the AIA G702/G703 Schedule of Values match actual physical work installed on site.

Do you verify AIA Document G702 and G703 pay applications?

Yes. You provide the general contractor's current AIA G702 Application and Certificate for Payment and G703 Continuation Sheet prior to our site visit. We audit each trade line item—sitework, foundation, framing, rough MEP, insulation, drywall, roofing, finishes, and stored materials—and flag any front-loaded or over-billed percentages.

Can Echo Point Aero add aerial progress orthomosaics to monthly lender draw reports?

Absolutely. Through our sister division Echo Point Aero, lenders and out-of-state equity sponsors can add repeatable GPS-locked drone progress photos and orthomosaic site maps showing grading, utility trenches, slab pours, tilt-up panel erection, and roof membrane installation month over month.

Which types of Southern Nevada construction loans do you support?

We support commercial ground-up construction, commercial Tenant Improvement (TI) buildouts, SBA 504 and 7(a) owner-user projects, multi-family value-add renovations, and private-lender / hard-money residential fix-and-flip or custom spec draws across Clark County.